Date and Area of Electronic Power Outage | ||
Date & Time |
Affected Areas | |
Saturday,August 28th, 2010. |
08:00 ~ 13:00(5 hours) | Buildings: 1, 2, 13, 20, 21, 21-1(Reagent storage house), 22, 23, 43, 47, 49, 59, 60, 62, 64, 82, 83, 109, 113, 130, 131, 133, 140, 140-1. (24 Areas) |
08:00 ~ 11:00(3 hours) | Buildings: 24, 27, 28, 56, 65, 102. (1,000KVA, 6 Areas) | |
13:00 ~ 18:00(5 hours) | Buildings: 15, 16-1(Shinyang Social Sciences Hall), 17, 50, 51, 52, 52-1(College of Fine Art: Liberal Education Practical Building), 52-2(Open Sculpting Practical Area 2) 53, 54, 55, 57, 58, 63, 68, 68-2(Maintenance Office), 70, 71, 71-1, 72, 73, 74, 84, 101, 103, 117(Pumping Station), 121, 137, 137-1, 137-2(Daelim International House), 144(Rear Gate Guard’s Office), 207(College of Fine Art: Open Practical Building 1), 919, 920, 921, 922, 923, 924, 925, 926, 941. Gooksoo Peak (국수봉), B-Gate, C-Gate, Construction site for Gwanaksa. (45 Areas) | |
Sunday,August 29th, 2010. |
09:00 ~ 11:00(2 hours) | Buildings: 25-1, 102, 138, 139-1, 142, 314, 500, 506(College of Natural Sciences Reagent Storage). (8 Areas) |
09:00 ~ 13:00(4 hours) | Buildings: 45, 48, 48-1, 104, 104-1, 104-2, 104-3(Storage house for the Semiconductor Research Center), 105, 105-1, 107-1(Bungalow), 107-2, 107-3, 132, 301, 310, 311. Jaun Temple (자운암)(17 Areas) | |
14:00 ~ 16:00(2 hours) | Buildings: 39, 40, 44, 44-1, 75, 75-1(Cafeteria No. 3), 99-1(Tennis courts at the College of Engineering), 135, 200, 201, 203, 302, 302-1(Storage house for hazardous material), 312, 313, 330, 331(Garage).Archives, Research Center for Civil & Environmental Engineering. (19 Areas) | |
14:00 ~ 18:00(4 hours) | Buildings: 18, 19, 30, 30-1(Storehouse for hazardous material), 30-2(College of Engineering Snack Bar), 31, 31-1(Accelerator production room), 32, 33, 34, 35, 36, 37, 38, 41, 42, 42-1(Research Center for Sloshing), 43-1, 69.Construction site for Haedong Academic Hall(해동학술관). (20 Areas) |
■ Request of Cooperation
ㆍInform the teaching staff of the power outage in advance.
ㆍPlease prepare in advance to minimize damages concerning laboratory and research center equipment.
ㆍIn order to prevent damages to electrical appliances, unplug all appliances prior to the power outage.
Once electricity returns, check the power for disorders before use.
ㆍSurveillance Equipment (CCTVs and such for crime prevention) may stop working during the electric
power outage. Please pay attention to surveillance and crime prevention during this period.